My Photo

Join Coca-Cola Campaign Google Group

Bookmarks

Licence

  • Creative Commons License
    The contents of this blog are licenced under a Creative Commons Licence. Details>>.

« Challenge Anneka! - Start of Day 6 | Main | #Hashtags - I think this is what I was after »

Challenge Anneka! - End of Day 6

velux 025 velux 028

This is a pre-dated post. I didn't get time to post it in real time. I'd been invited to Sunday lunch by Carolyn. She rang at about 10 to say that there was a bit a slippage in timing and that they wouldn't be eating until 1:45 which was brilliant. I needed the extra time and in the end this worked perfectly by 1:15 the last bit of flashing slipped into place and the drip, drip, drip stopped and I was able to throw the layers and layers of very wet cardboard outside and walk away from the building site to a fantastic lunch with great company.

After lunch I went to see the patient and had to confess to what I'd been up to as I needed to get back to get the tiles on before dark. The patient was very pleased! :-)

With the flashing and tiles in place I can relax. The interior can been completed at leisure.

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/t/trackback/1123249/27952312

Listed below are links to weblogs that reference Challenge Anneka! - End of Day 6:

Comments

Post a comment

If you have a TypeKey or TypePad account, please Sign In

Track changes on this Blog

  • Using an RSS Reader . . .
  • Or using Email . . .

    Enter your email address:

    New posts will be sent to you by FeedBurner

Nominated

  • nominated for the New Media Awards - 2008

Participation Ride blog 2006

Stats